This is a project recently completed in Idaho. 40MWac POI and 54.22MWdc. Just over 100,000 panels on the site. Designed in late 2022 and put in operation 2023.
This is a project recently completed in Idaho. 40MWac POI and 54.22MWdc. Just over 100,000 panels on the site. Designed in late 2022 and put in operation 2023.